Public Workspaces

Title Precoat passage - next steps
Description
Based on discussions during a few ad-hoc calls, the group has determined 3 possible paths forward for the pre-coat passage issue paper.

This straw ballot will be open for 10 days.
Ballot Options Ballot has closed
[ ] Revise Standard 50 to address the MAHC language eliminating the open loop pre-coat process. (lower the NTU allowed /remove open loop option / etc.)
[ ] Leave standard as is and submit a change request to the MAHC to specify when pre-coating should occur. At the end of the day when the venue is closed. The turbidity allowed into the water would be filtered out during the off hours.
[ ] No action needed.
Opening Date Mon, May 22 2023 12:30 pm Eastern Daylight Time
Closing Date Thu, Jun 1 2023 11:59 pm Eastern Daylight Time
Ballot has closed.

Referenced Items

Name Type Date Actions

08375: Precoat passage - next steps

Document (Archive)

2023-06-02

MAHC CR

Document

2023-05-22

RWF-2021-9 - Precoat passage.pdf

Document

2023-05-22