Joint Committee on Public Drinking Water Equipment Performance

Document:
Combined 419i1r3 ballot & JC memo.pdf

Draft (A preliminary sketch, outline, or version.)

Details

Submitted By Monica Leslie on 2014-10-23 7:46 pm Coordinated Universal Time

Publication Type

None at this time.

Group / Folder

Joint Committee on Public Drinking Water Equipment Performance / Ballot Documents / 2014 / 419i1r3 - NSF 419

Modified by

Not modified.

Copy

This document is not a copy.

Technical Contact

None at this time.

Download Count

421

Commenting

Comments can be added by
Public
Comments can be viewed by
Public

Download Agreement

None at this time.

Description

None at this time.


Comments

Showing 9 of 9 comments
Subject#StateSubmitterDateAction
JM comments on separate page0NewJohnny Mendez2014-11-13Details
Approve with comments0AddressedJohnny Mendez2014-11-13Details
Test Pressure: Contact Angle goes to Zero at Bubble Point0AddressedJohn Minnery2014-11-12Details
6.3 Apparatus0NewMichael Finn2014-11-12Details
6.3 Apparatus0NewMichael Finn2014-11-12Details
5.6.1 Test dust loading0NewMichael Finn2014-11-12Details
5.6.1 Test dust loading0AddressedMichael Finn2014-11-12Details
Sentence structure, is something missing?0NewTim McCandless2014-11-04Details
Sentence structure, is something missing?0AddressedTim McCandless2014-11-04Details