The currently proposed new langauge seems awkward to me.  I'm voting affirmative because I agree with the intent but would prefer more clarity.  The language states:

Alternate inflow measurement methods shall only be used for any or all of the following reasons:

the space between the base of the DIM and permanent fixture directly opposite the access opening is a minimum 6 in (150 mm);

If I'm reading this as a field certifier, I'm wondering which way the cut off goes.  It would be clearer if it stated:

the space between the base of the DIM and permanent fixture directly opposite the access opening is less than 6 in (150 mm);

 