Mr. Hemang Patel added comment "Make 1 hour wait time consistent for all POU flowrates" to the document "42i131r1 - Chloramine Run Time - JC memo & ballot.pdf" in the "Joint Committee on Drinking Water Treatment Units" group.
Subject: Make 1 hour wait time consistent for all POU flowrates Category: N/A Comment operational cycles ballot (42i109r5) specifically called out chloramine sampling as one needing to have this 4 hour wait period, So I do not agree with the rationale provided.
I do not mind 1 hour or 4 hour wait for sample collection as long as it is consistent for all POU flowrates in terms of having a fair standard. POU filters with <1gpm are routinely installed in high traffic areas like POU dispensers, water coolers, fridges etc in schools, airports, bus stations, hospital waiting rooms etc so I do not see why this subcategory be judge to an easier sampling technique than other POU filters.
. Proposal Make 1 hour wait time consistent for all POU flowrates
Comment Number: #12300 Submitter: Mr. Hemang Patel Date submitted: 2024-02-07 19:30:37 Status: new View Comment Details View Document Details Download Document |
---------------------------------
Hemang Patel Technical Manager
Technical Manager
Cuno, a 3M Company
203 238-8818 Technical Manager
hrpatel@mmm.com---------------------------------